Shoddy road works irk residents


1 Chui says the road needs to be leveled well by raising the road surface or realigning the manhole cover.2 This drain on Jalan 5/60 is almost completely covered, leaving only a small hole after it was resurfaced.— Photos: CHAN TAK KONG/The Star

A MONTH ago, part of Jalan 5/60, Petaling Jaya was resurfaced but it was a shoddy job and nearby residents noticed that asphalt from the resurfacing had spilled into the drains and had hardened.

Fraser Towers Residents Association (RA) chairman W.K. Chui said although he was grateful to Petaling Jaya City Council (MBPJ) for the resurfacing effort, he was upset that it had not been done well.

Limited time offer:
Just RM5 per month.

Monthly Plan

RM13.90/month
RM5/month

Billed as RM5/month for the 1st 6 months then RM13.90 thereafters.

Annual Plan

RM12.33/month

Billed as RM148.00/year

1 month

Free Trial

For new subscribers only


Cancel anytime. No ads. Auto-renewal. Unlimited access to the web and app. Personalised features. Members rewards.
Follow us on our official WhatsApp channel for breaking news alerts and key updates!
   

Others Also Read