Accidents continue to occur even after the construction of a road divider at the junction of Kajang-SILK Highway and Taman Impian Ehsan in Balakong.
THE concessionaire of the Kajang-SILK Highway will place speed breakers at the exit to Taman Impian Ehsan in Balakong to reduce accidents.
Accidents have taken place at the area, especially during the evening rush hour, despite having a 400m concrete divider.
Already a subscriber? Log in
Save 30% OFF The Star Digital Access
Cancel anytime. Ad-free. Unlimited access with perks.
